Address
KNAPP Controls Desk
1800 Intralogistics Way, Suite 400
Atlanta, GA 30308, USA
Share load units, peak windows, interface owners and site constraints. A compact inquiry modal is available elsewhere on the site; this page is the full contact path with channels, map context and the documents that speed triage.
KNAPP Controls Desk
1800 Intralogistics Way, Suite 400
Atlanta, GA 30308, USA
Monday–Friday
08:00–17:30 local project timezone
Engineering response windows by contracted scope
Warehouse operations and IT/OT teams get faster answers when the first message already names the operating boundary. Include load unit dimensions and mass, active SKU count, peak order lines per hour with window duration, and whether WMS, WCS, WES, PLC or fleet management owns each handshake. If the site is brownfield, note live aisle constraints, fire routes and any host freeze windows.
If you are still assembling those inputs, open the RFQ Data Sheet first. Incomplete peaks without buffer occupancy or exception recovery assumptions will be returned with clarifying questions rather than a forced concept sketch.
Social channels are limited to project coordination aliases published after an NDA when required. Public marketing inboxes are not used for FAT/SAT evidence exchange. For multi-site programs, list each building’s peak window separately so buffer occupancy and cutover sequencing stay distinguishable.
Use the structured fields below. For the five data classes, attach notes in the message or reference the RFQ Data Sheet. Describe selectivity targets, divert accuracy needs and recovery ownership when they already exist in your draft matrix.
Submitting this form does not create a certified performance claim. Planning-range staffing and country figures on other pages remain evaluation framing only until a signed scope confirms them.